A portable EV charger can suit sites where locations or vehicle numbers change. Portability does not remove the need to check supply capacity, grounding, protective devices and vehicle compatibility.
Contents
- Checks before taking a charger to a site
- Where to charge and for what purpose
- Check the combination of vehicle and charger
- Check the power supply at the destination first.
- Check movement, installation, and cable handling
- Align operations for starting, stopping, and abnormalities
- Inspection/maintenance and estimate total costs
- Information to gather before the trial
- Summary: Evaluate portability based on on-site usage conditions
- Technical support information
- Related Articles
- Discuss your project
In evaluation yards, temporary work areas, and sites with multiple test vehicles, the ability to move equipment to the location where it needs to be charged is a consideration. Before increasing fixed equipment, you want to make sure that it can accommodate temporary use or changes in location.
However, the name "portable" alone does not determine the location or vehicle where it can be used. Being able to operate your device and being able to safely charge it while on the move are two different things. In this article, we will organize the items to check before installation in the order of target vehicle, power source, travel route, usage procedure, and maintenance.
Checks before taking a charger to a site
| Item | What to check | How to assess it |
|---|---|---|
| Supply | Voltage, capacity, connector and grounding | Protection and permitted current |
| Vehicle | Connector, protocol and charging conditions | Test the intended combination |
| Location | Rain, temperature, paths and cables | Environmental limits and safe placement |
Where to charge and for what purpose
First, specify the vehicle you want to charge and the usage scenario. Will it be used between evaluations of development vehicles, for exhibitions and demonstrations, or will it be used temporarily in multiple locations? The required configuration and procedures will vary depending on the charging time, number of trips, and person operating the device.
For example, even if you are moving within the same site, the ease of handling will differ depending on whether you are traveling only on paved roads or over steps and slopes. If you have decided on a location, check the route from where the device will be stored to the charging location. This is to replace the "movable" function with a usage that can be reproduced on site.
The illustrations in this article are images that refer to the appearance of our equipment. The output, compatible vehicles, outdoor usage conditions, presence or absence of a built-in power supply, etc. cannot be determined from the appearance alone. Check the target version and specifications of the device you are considering, and check the conditions necessary for the application one by one.
Check the combination of vehicle and charger
Check the charging method and connector of the target vehicle, the electrical conditions on the charger side, and the compatible range of communication and control. Just because the connector can be connected does not necessarily mean that charging will start, stop, or handle abnormalities. Evaluation based on the specifications of the target vehicle and the actual combination is required.
Vehicles under development or test configurations may have different conditions than mass-produced vehicles. Prepare the target version of the vehicle, the settings required for charging, and the condition to be evaluated. It is important not to treat the results of a demonstration conducted on another vehicle as the compatibility results of the current vehicle.
| Area to check | Necessary information | Situation to evaluate |
|---|---|---|
| Vehicle side | Charging method, connection/control conditions | Start, stop, abnormality |
| Power side | Power supply type, capacity, connection conditions | Operation in conjunction with other equipment |
| Installation/Movement | Dimensions, weight, route, location | Moving, installing, storing |
| Operations | Person in charge, inspection, recovery procedure | Daily use, failure, replacement |
Only when the items in this table are complete can we consider whether or not it can be used in the field. In particular, the conditions of the vehicle and power supply are not inferred from the appearance or product name, but are confirmed through documentation and tests.
Check the power supply at the destination first.
Even for portable chargers, the required power source is determined by the configuration of the target device. Just by looking at the electrical outlets and distribution boards on-site, it is difficult to tell whether the necessary power can be supplied. Gather the type of power source, available capacity, connection method, and confirmation from the facility manager.
When using the charger at the same time as other devices, check not only the conditions of the charger but also the usage status of the entire site. Differentiate between input conditions and charging output and evaluate according to the specifications of the target device. If you move to more locations, check the conditions at each location and clarify where you can use it.
Do not use “portable” and “no construction required” to mean the same thing.
Even if you can move equipment, you may need to add or change power sources, or verify protection and connections. Confirm with the facility manager and construction personnel what work is required to connect to existing electrical equipment. In addition to the selling price of the equipment, we also include the necessary preparations on site in the scope of the estimate.
Even if temporary use is planned, do not leave it up to users to decide how to extend or connect cables. Decide which configurations can be used, what to check before use, who to consult when making changes, and avoid operations where the person in charge has to guess and connect at each site.
Check movement, installation, and cable handling
Portability cannot be evaluated just by the presence of casters and handles. Check weight, lifting needs, aisle width, doors, steps, slopes, and floor conditions. We actually move the equipment from the storage location to the usage location to confirm that it can be handled by the expected number of people and procedures.
After installation, confirm that the equipment can be placed stably and that it will not obstruct the passage of vehicles or people. In addition to ensuring that the cable reaches the vehicle, we also consider placing the cable so that it does not cross traffic lines, routing the cable so that it does not put excessive force on the connection, and storing it after use. Organize device movement and charging operations as separate steps.
Also check that connectors and cables are protected during storage and transportation. Even if it looks like it can be stored, we evaluate the user's operation to see if there are any problems, such as things getting caught during daily transportation or being bent too hard each time they are stored. The usage environment, such as indoors or outdoors, should match the conditions of the target device.
Align operations for starting, stopping, and abnormalities
Determine the flow of inspection before use, connection, start and end of charging, removal, and storage. The displayed status corresponds to the next operation so that even if the person in charge of operations changes, they can be checked in the same order. Do not confuse the end of charging with the ready-to-move state of the device.
It is also necessary to deal with cases where communication is not established, charging stops midway, or the status is unknown. Determine the range in which users are allowed to retry and the range in which they should stop using the service and contact the person in charge. Check the procedure for emergency shutdown and subsequent inspection and restart according to the instructions for the target equipment.
For applications that require records, see what you can capture, such as vehicle, time of day, driving status, reason for stop, etc. Items that cannot be retrieved are treated as not retrieved instead of being estimated and filled in on the screen. Even if the data used for evaluation records and cost allocation have the same definition, organize them by usage.
In the documentation explaining the operation, the instructions correspond to the actual equipment display. If you reuse operating instructions from other products with similar appearance or old screens from prototyping, the location you press and the conditions you check may be different on site. Align the versions of equipment and materials, and hand over any updates or specification changes to the operator.
Inspection/maintenance and estimate total costs
After installation, it is necessary to inspect cables, connectors, casters, etc., isolate failures, and follow the flow of replacement and repair. We will clarify who will conduct daily inspections and under what conditions the product will be discontinued. When leaving equipment for maintenance, alternative charging options are also an operational consideration.
Costs are compared not only for equipment, but also for power supply preparation, on-site evaluation, movement and storage, operation training, inspection, and maintenance. If you plan to carry the device to multiple locations, consider the time it will take to move it and the amount of time you will be using it in one location while not being able to use it in another location. Comparisons with fixed equipment are also made based on actual usage frequency and placement conditions.
The value of portability also changes between temporary use and near-permanent use. If you want to keep it in the same place every time and it takes time to move it, fixed equipment may be more suitable for your operation. On the other hand, if the evaluation location changes, consideration should be given to whether power conditions and moving procedures can be standardized. This is a comparison so you don't choose just based on name or unit price.
Information to gather before the trial
- Target vehicles, charging conditions, usage locations, and charging times
- Available power sources and on-site equipment/construction personnel
- Storage location, movement route, level difference/slope, installation location
- Operator, inspection/failure response, logs to be obtained
During the trial, we record not only the results of charging, but also the movement, preparation, operation, and storage after completion. By determining the necessary conditions and pass/fail criteria for your application in advance, you can decide whether to implement it, change the configuration, or choose another method.
For example, if you plan to use it at two evaluation locations, record the power supply check, preparation time, vehicle connection, and movement at each location separately. By distinguishing between the results of charging in one place and the results of being able to carry the battery to multiple locations, you can find additional conditions to check next.
Summary: Evaluate portability based on on-site usage conditions
When considering a portable EV charger, match the target vehicle and power supply conditions, and check the steps from transportation to maintenance. The key to choosing a configuration that can be easily used even after installation is to connect equipment specifications and on-site evaluation, rather than guessing how to use it based on the name "portable".
Technical support information
At LinkT&B, you can consult with us about EV charger circuits, communication, control, prototyping, and evaluation. Check the application and the conditions of the target equipment and organize how to proceed. For individual inquiries regarding applicable vehicles and usage location conditions, please contact us via Contact Us.
Related Articles
Managing Fleet EV Charging Costs by Site and Vehicle
Starting a Development Project Without a Specification
Discuss your project
We help plan charging equipment, authentication and management around vehicle use and parking time. Tell us about your fleet and existing facilities.