Starting a Development Project Without a Specification

Updated: 12 October 2026

Can we consult on development even if we don't have specifications? image of

An electronics development discussion can start before a complete specification exists. The use case, current problem and operating conditions help define measurements and prototypes. Separate agreed requirements from open questions before estimating cost and schedule.

Contents
  1. Information for the first development discussion
  2. First, communicate the problem rather than the function.
  3. Organize objectives, requirements, and specifications separately
  4. Usage conditions determine the scope of the design
  5. Reduce unknown points with small verification
  6. Align deliverables and pass/fail conditions before starting
  7. Information to bring to the initial consultation
  8. Summary: Specifications can be made concrete through consultation.
  9. Technical support information
  10. Related Articles
  11. Discuss your project

“There are things I want to accomplish, but I haven't written them into specifications.” “I don't have a specialist in-house, so I don't know what to decide.” Development consultations can begin even without a completed specification. In the early stages, technical foresight may be needed to develop specifications.

On the other hand, if you start production with ambiguity, you will run into the problem that the product is not what you wanted after it is completed. What is needed at the beginning of a consultation is not to decide on all the details, but to share the purpose, usage, constraints, and evaluation method. In this article, we will introduce how to gather information to proceed from initial consultation to specification and prototyping.

Information for the first development discussion

ItemWhat to checkHow to assess it
UseWho operates it, where and howUse cases and operating sequence
ConstraintsPower, dimensions, temperature and locationDesign limits
AcceptanceWhat makes the prototype acceptableMeasurements and verification methods

First, communicate the problem rather than the function.

Simply stating that you want a wireless device does not determine the communication method, power supply, and screen you need. By telling them what work you want to change, who will use it where, and what is currently taking their time, you will be able to prioritize the features to be developed.

For example, if you want to check the status of remote equipment at your office, you can consider the necessary data and notification method by asking about the status you want to check, how often you want to check, and what to do after you learn of an abnormality. The scope of design and evaluation is different between simply displaying a list of numerical values ​​and determining whether equipment should be shut down.

It is also effective to explain the current steps step by step and include recording sheets, existing screens, hand-drawn diagrams, etc. Rather than trying to use formal terminology, it will be easier for developers and users to agree on the same understanding by specifically saying, “In this situation, this person wants to see this information.”

If we describe the process from start to finish as an example, we can also find conditions outside the equipment. Who will turn on the power, select the target, check the results, and take over the records? Rather than explaining how to operate only the equipment, it is better to share how to use it in line with actual work, so that you can organize the necessary operations and what to do in case of abnormalities.

Organize objectives, requirements, and specifications separately

The purpose is the change in work that you want to achieve, the requirements are the conditions you want to meet for that purpose, and the specifications are the specific design conditions to realize the requirements. If you try to decide on these three things at once, you will be drawn to technical choices and lose sight of your true purpose. First, organize things in order from purpose to requirements, and then from requirements to specifications.

stage of organizingEquipment monitoring exampleTreatment during initial consultation
purposeReduce the burden of patrollingShare your current work and problems
requestI want to check the status of equipment at the office.Define users, situations, and required information
SpecificationsDeciding on signals, power, communication, and displaySpecification based on local conditions and technical verification
EvaluationAre on-site records and displays compatible?Agree on test method and pass/fail conditions

For example, if you specify a communication method first, it may appear that you need to change the purpose in places where that method cannot be used. In reality, you may want to consider other methods such as a wired connection or taking your records home. Separating the essential conditions from the desired means allows you to compare alternatives.

A desktop image that materializes into a small prototype from notes and composition sketches.
Figure 1. An image of bringing notes about problems, sketches of configurations, and small prototypes to make requests concrete.

Usage conditions determine the scope of the design

The conditions to check differ between devices that operate on a desk and devices that are used in the field for a long time. These include whether it is indoors or outdoors, the ambient temperature, the effects of water and dust, the type of power source, installation space, communication restrictions, and user operation methods. If the specific value is unknown, leave it as an item to be measured later.

You will also need information about the person you are connecting with. Check the model of existing equipment, connection method, available data, and internal network limitations. If you proceed without knowing the specifications and connection permissions of the external system, even if the device itself works, it may not be possible to transfer the necessary information.

Requirements and features that can be added later

If all requests are included in the first prototype, it will be difficult to isolate what did not work. Divide it into core functions that you want to check first, essential conditions for use in the field, and useful functions that can be added later. Even if there are budget or timing constraints, decide which features to keep before considering which features to cut.

Reduce unknown points with small verification

If there are major uncertainties at the initial stage, there is a way to conduct tests to confirm feasibility first, rather than making the finished product all at once. Using off-the-shelf evaluation boards, sensors, and simple models, we check whether the necessary signals can be obtained, processing can be done in time, and connections can be made in the expected manner.

It is important to clarify the range that can be said to have "moved" during this verification. The fact that the screen moves with dummy data does not prove that the field data can be handled correctly. We separately record the desktop prototype, confirmation using actual data, and evaluation in the actual installation environment, and leave any issues to be carried forward to the next stage.

The list of unknowns also includes how to check and what the results change. If the sensor cannot distinguish the status, we will change the method, and if we cannot obtain permission to connect to existing equipment, we will consider another acquisition method. By investigating items that have the greatest impact on decisions, you can significantly reduce the possibility of reworking them in later processes.

Verification results are organized with not only successful operations, but also test conditions, failure cases, and points where the design needs to be changed. Even if it turns out to be difficult to achieve, if you understand the reason, you can use it to decide whether to change the method, narrow down the target, or stop development.

Align deliverables and pass/fail conditions before starting

When making a development request, we not only say “we will make a device,” but also decide what we will receive. The scope of work varies depending on the deliverables, such as circuit diagrams, boards, embedded software, analysis models, evaluation reports, and operating instructions. Even for partial requests such as design only, analysis only, or evaluation only, we check the communication between the previous and subsequent processes.

If the acceptance inspection condition is only “it works normally,” the judgment will be influenced by the impression of the person in charge. Specify which inputs, loads, usage environments, and which outputs and operations must be possible to pass the test. By matching the items to be measured and the test method to the specifications, you will know what to check even during the design process.

When inheriting existing drawings, software, or prototypes, check the target version and whether there is data that can be edited. The scope of reuse, rights to third-party parts and software, and who will be responsible for post-delivery modifications and maintenance should also be included in the contract and ordering conditions. This is to confirm that the work will be usable even if the person in charge changes.

When comparing estimates, consider not only the number of prototypes, but also the extent to which research, design, evaluation, and document creation are included. Even if the prototyping cost is the same, if on-site evaluation and delivery of design data are not covered, the cost of the next stage will change. Identify non-coverage work and conditions that require additional judgment.

If the usage conditions change after determining the specifications, leave the changes and check the impact on cost, schedule, and testing. It is important not to mix requests during consultation, requests that have been agreed upon, and changes made after work begins in the same list. Even small changes can be tracked to which deliverables and evaluations are reflected.

Information to bring to the initial consultation

  • Current work, situations where you are having trouble, and how you want to use it
  • Essential functions, desired functions, and things to decide after prototyping
  • Devices to be connected, power supply, installation location, presence of existing materials and actual items
  • Budget/timing constraints, internal judge, person in charge of evaluation
  • Necessary deliverables such as drawings, software, evaluation reports, etc. and scope of handover

There is no need to decide everything before consulting. Bring in “what you know,” “what you have temporarily,” and “what you won't know until you investigate.” By separating items that require testing, items decided internally, and items proposed by the developer, the next step will become more concrete.

Summary: Specifications can be made concrete through consultation.

The lack of specifications is not a reason for not starting a consultation. We share the purpose and usage, confirm constraints, and reduce uncertainties through small verifications, and incorporate them into design conditions and evaluation methods. Matching the scope and deliverables before placing an order is the key to reducing rework later on.

Technical support information

At LinkT&B, you can consult with us about requirements organization, specification formulation, analysis, circuit/embedded design, prototyping/evaluation. We will organize the scope of support, including partial support. For more information, please see R&D/Power Electronics Business, and for individual consultation, please see Contact Us.

Related Articles

When Simulation and Measurements Disagree
Why a Working Prototype Can Stall Before Production

Requirements planning reference: IPA guide (Japanese)